GSK Stevenage

Gsk 8099 Building 1 Re Fresh Project (1)

GSK Stevenage

Color Border 5px
PROJECT:

Bridging The Gap

A Layher system with fully encapsulated cantilevered hanging scaffolds to both sides was constructed for refurbishment works to be carried out for a pedestrian bridge on the GSK Site.

The encapsulation was required to prevent any cleaning chemicals, dust or debris entering the surrounding water.

Public access was maintained throughout the duration of the project, requiring careful design, planning and co-ordination throughout.

Have a project coming up?

Contact us today

Send us an enquiry

CTA Form
Color Border 5px

Other Projects

Color Border 5px

Memberships, awards and certifications