Olympic Park, Stratford

Header Image

Olympic Park, Stratford

Color Border 5px
PROJECT:

London 2012 Olympics

Connect Scaffolding, Connect Events and Connect Hoist Teams all worked on a number of the Olympic venues including Lea Valley, for the white water rafting.

GEDA Transport Platform were installed for disabled access along with Staircases and walkways for spectator access to stands. Ramped Disabled access at Greenwich for the Equestrian Events, the Olympic Park for the construction of the Basketball venue and temporary disabled access for the Cycling events.

Due to the tight time constraints and the need for proven strength capabilities, Connect used their Layher System to provide the designed structures, allowing them to be constructed both safely and efficiently.

Have a project coming up?

Contact us today

Send us an enquiry

CTA Form
Color Border 5px

Other Projects

Color Border 5px

Memberships, awards and certifications